top of page
White Structure
Spider Working Floor
  1. EXISTING WELLHEAD

  2. 7-11/16" SINGLE RAM BOP 2/5 K Psi

  3. 7-11/16" ANNULAR

  4. SPIDER WORKING FLOOR

  5. TUBING HYDRAULIC POWER TONG

  6. POWER SWIVEL

  7. GENSET (*)

  8. TUBING SLIPS & SAFETY CLAMP

  9. 2-3/8: PRODUCTION TUBING/NQ/BQ/PIPE10 TUBING ELEVATOR

  10. MUD/WATER TANK

  11. MOBILE CRANE (*)

  12. H2S & CO2 GAS DETECTOR/SENSOR

  13. BOP ACCUMULATOR15 HYDRAULIC POWER PACK16 MUD PUMP

image.png
EPINDO---HEADER.png

Industrial Estate Taman Tekno
Bumi Serpong Damai Block A2/29 Sector XI
South Tangerang, Banten Indonesia

       info@energiprimasia.com
       +62 21 727 93946

Contact us

©2025 by PT Energi Prima Indonesia

bottom of page